Parking Lot Construction in Plano, Texas

Complete parking lot construction services throughout Plano and Collin County. We coordinate commercial parking facilities with concrete and asphalt paving, comprehensive drainage systems, ADA-compliant design, lighting, and landscaping. From site planning to final occupancy, we connect your Plano property with experienced parking lot contractors who deliver quality construction that meets building codes and provides long-term performance.

  • Site Planning: Design & engineering
  • Paving: Concrete & asphalt installation
  • Drainage: Stormwater management
  • ADA Compliance: Accessible design

Complete Parking Lot Construction Services

Parking lot construction requires coordination of multiple disciplines—civil engineering, pavement design, drainage systems, lighting, landscaping, and regulatory compliance. In Plano, where building codes and environmental regulations are stringent, professional parking lot construction ensures facilities that serve their purpose for decades. Our network includes experienced parking lot contractors who coordinate all aspects of commercial parking facility construction.

From initial site planning to final landscaping, we ensure every parking lot meets owner requirements, building codes, ADA accessibility standards, and environmental regulations. Whether constructing a new retail center parking lot or expanding an existing facility, our approach delivers quality construction that enhances property value and provides reliable performance.

Parking Lot Construction Types

Concrete Parking Lots

Durable concrete pavement for heavy-use applications

Advantages

  • Superior durability (30-50 year lifespan)
  • Low maintenance requirements
  • Light-colored surface reduces heat island effect
  • Excellent load-carrying capacity for trucks
  • Resistant to fuel and chemical spills

Applications

Shopping centers, industrial facilities, multi-story parking

Cost Range

$8-15 per square foot installed

Asphalt Parking Lots

Cost-effective asphalt paving for general parking

Advantages

  • Lower initial cost
  • Faster construction and traffic opening
  • Easier to repair and resurface
  • Good performance for light to medium traffic
  • Regular maintenance extends service life

Applications

Office buildings, retail parking, residential communities

Cost Range

$4-8 per square foot installed

Permeable Pavement

Environmentally friendly paving allowing water infiltration

Advantages

  • Reduces stormwater runoff and flooding
  • Recharges groundwater and reduces erosion
  • Meets environmental regulations
  • Reduces heat island effect
  • Sustainable construction practice

Applications

Municipal projects, green building certifications, flood-prone areas

Cost Range

$10-20 per square foot installed

Heavy-Duty Industrial Paving

Reinforced concrete for industrial and trucking applications

Advantages

  • Handles extremely heavy loads (semi-trucks, forklifts)
  • Thick reinforced concrete (8-12 inches)
  • Designed for constant heavy equipment traffic
  • Long-term performance in industrial environments
  • Resistant to impact and abrasion

Applications

Warehouses, distribution centers, manufacturing facilities

Cost Range

$12-25 per square foot installed

Key Parking Lot Design Considerations

Traffic Flow & Capacity

  • One-way vs. two-way traffic patterns
  • Peak hour capacity requirements
  • Emergency vehicle access and turning radii
  • Pedestrian safety and crosswalks
  • Loading zone and service area placement
  • Traffic calming measures for safety

Impact: Proper design ensures smooth operation and safety

ADA Compliance & Accessibility

  • Accessible parking space requirements (1 per 25 spaces minimum)
  • Van-accessible spaces with proper access aisles
  • Accessible routes to building entrances
  • Ramp slopes and handrail requirements
  • Vertical clearance for accessible routes
  • Tactile paving and warning surfaces

Impact: Federal law compliance prevents legal issues and ensures accessibility

Drainage & Stormwater Management

  • Positive drainage away from buildings
  • Storm drain placement and sizing
  • Permeable pavement options
  • Retention pond design and sizing
  • Erosion control during construction
  • TCEQ stormwater permit compliance

Impact: Proper drainage prevents flooding and environmental violations

Lighting & Safety Features

  • Illumination levels meeting local codes
  • Light pole placement and spacing
  • Emergency call stations
  • Security camera mounting provisions
  • Reflective striping and signage
  • Speed bumps and traffic control devices

Impact: Safety features reduce accidents and improve security

Parking Lot Construction Process

1

Planning & Engineering

Design and permitting phase

  • Site survey and existing condition assessment
  • Traffic study and capacity analysis
  • Civil engineering design (grading, drainage, utilities)
  • ADA compliance planning
  • Environmental impact assessment
  • Permit applications and approvals

Duration: 4-8 weeks

2

Site Preparation

Clearing and grading the site

  • Demolition and debris removal
  • Tree protection and relocation if required
  • Rough grading and excavation
  • Utility installation and coordination
  • Soil stabilization and compaction
  • Erosion control measures installation

Duration: 2-6 weeks depending on site size

3

Base Construction

Subbase and base course installation

  • Subgrade preparation and proof rolling
  • Aggregate base course placement
  • Compaction testing and verification
  • Base course grading and fine-tuning
  • Drainage system installation
  • Quality control testing of base materials

Duration: 1-3 weeks

4

Pavement Installation

Concrete or asphalt paving

  • Concrete formwork or asphalt paver setup
  • Material placement and consolidation
  • Surface finishing and texturing
  • Joint installation (concrete) or compaction (asphalt)
  • Curing procedures for concrete
  • Quality control testing of pavement

Duration: 1-4 weeks depending on size and weather

5

Finishing & Landscaping

Final touches and site completion

  • Striping and signage installation
  • Lighting system installation and testing
  • Landscaping and irrigation
  • Final grading and seeding
  • Cleaning and site restoration
  • Final inspection and occupancy

Duration: 2-4 weeks

Parking Lot Maintenance Considerations

Proper maintenance planning during construction ensures long-term performance and reduces future costs:

Concrete Parking Lots

Schedule: Annual inspection, 5-10 year maintenance cycle

Services

  • Joint sealing every 3-5 years
  • Surface cleaning and pressure washing
  • Crack repair as needed
  • ADA compliance verification
  • Drainage system cleaning
  • Sealant application for protection

Asphalt Parking Lots

Schedule: Annual inspection, 3-5 year maintenance cycle

Services

  • Sealcoating every 2-3 years
  • Crack sealing annually
  • Pothole repair as needed
  • Striping refresh every 1-2 years
  • Drainage cleaning
  • Surface milling and overlay every 10-15 years

Frequently Asked Questions

How long does parking lot construction take in Plano?

Timeline varies by size and complexity. Small parking lots (50-100 spaces) typically 4-8 weeks. Medium facilities (100-300 spaces) 8-16 weeks. Large commercial lots (300+ spaces) 12-24 weeks. Factors affecting schedule: weather delays during wet season, utility coordination, permit processing (4-8 weeks), and site complexity. Fast-track construction possible for urgent projects using additional crews and overtime. Most Plano projects complete within 8-16 weeks from design to occupancy. Weather contingency built into all schedules.

What's the cost difference between concrete and asphalt parking lots?

Concrete parking lots cost $8-15 per square foot installed vs. asphalt $4-8 per square foot. Concrete higher initial cost offset by: 30-50 year lifespan vs. 15-25 years asphalt, lower maintenance costs, better durability for heavy traffic, reduced heat island effect, and higher property values. Asphalt lower upfront cost but higher long-term costs from frequent sealcoating ($0.15-0.35/SF every 2-3 years) and earlier replacement. Break-even analysis typically favors concrete for 15+ year ownership. Most commercial properties choose concrete for long-term value despite higher initial investment.

Do parking lots require special permits in Plano?

Yes, parking lot construction requires multiple permits. City of Plano Development Services issues site development permit covering grading, drainage, utilities. TCEQ stormwater construction general permit for sites disturbing 1+ acre. ADA compliance verification. Traffic impact study for large projects. Utility locates through 811 system. Environmental permits for protected species or wetlands. Permit process 4-8 weeks—planning required. All work performed by licensed contractors with proper insurance. Non-permitted construction subject to stop-work orders and penalties.

How do you ensure ADA compliance in parking lot design?

ADA compliance verified through detailed design review. Minimum accessible spaces: 1 per first 25 spaces, plus 2% additional for large lots. Van-accessible spaces require 96-inch width + 96-inch access aisle. Accessible routes minimum 36-inch width, maximum 2% cross-slope. Vertical clearance 98 inches for van routes. Tactile paving at crosswalks. Proper signage and pavement markings. All designs reviewed by certified accessibility specialists. Post-construction verification ensures compliance. Non-compliant facilities subject to fines and legal action.

What's involved in parking lot drainage design?

Comprehensive drainage prevents flooding and extends pavement life. Design includes: topographic survey for natural drainage, storm drain placement at low points, minimum 2% slope for positive drainage, catch basin sizing for rainfall intensity (Plano 100-year 24-hour storm), permeable pavement options for environmental benefits, retention ponds for large developments, erosion control during construction. Drainage design coordinated with civil engineer and approved by City of Plano. Poor drainage causes premature pavement failure and creates liability. Professional drainage design essential for Plano's variable weather.

How often should parking lots be maintained?

Maintenance frequency depends on material and usage. Concrete lots: annual inspection, joint sealing every 3-5 years, cleaning as needed. Asphalt lots: annual crack sealing, sealcoating every 2-3 years, striping refresh annually. High-traffic lots require more frequent maintenance. Regular maintenance prevents major repairs—cost of preventive maintenance small compared to reconstruction. Most commercial properties budget 1-2% of replacement cost annually for maintenance. Proper maintenance extends service life significantly and maintains property value.

Precision Concrete

Ready to break ground on your next Plano project?

Talk with our project managers about tilt-wall builds, structural foundations, and site paving. We mobilize fast and deliver commercial-grade concrete that holds up to the toughest specs.